Villa Magdalenenhof

A place with many pasts and many futures

The building is scheduled for completion in July 2026. Photos of the completed complex will follow shortly.

The spatial concept emphasizes flexibility and includes generous, column-free communal areas, workshops with integrated teaching spaces, and two pavilion-like new buildings. The open spatial structures enable diverse forms of interaction, learning, and communication, thus opening up a wide range of future uses.

The design follows a sensitive and respectful approach to the existing structure.

The listed building fabric is preserved through targeted measures and complemented with high-quality materials.

FACTS

Adress:
Senderstraße 130, 1210 Vienna

Start of Construction:
April 2025

Completion:
July 2026

Project team:
Susanne Veit-Aschenbrenner
Oliver Aschenbrenner
Franziska Weber

Client:
City of Vienna, represented by WIP Wiener Infrastruktur Projekt GmbH

Structural Engineering:
Hollinsky and Partners

Building Physics:
Danzinger ZT GmbH

Fire Protection:
Frank Peter

Fotos and Plans:
© Veit Aschenbrenner Architekten