The existing school building within the residential block between Speisingerstrasse and Anton-Langer-Gasse is being expanded into a campus for 3-10 year olds, with 10 educational rooms, 4 group rooms, an exercise room, workshops, a dining hall and a standard gymnasium. The two-storey campus is embedded in the surrounding residential structure next to a residential park and a playground. The inner courtyard in the campus provides good lighting for all rooms and makes it easy for children and pupils to find their way around the building. Separate entrances for the two typologies enable functional structuring within the building, which are connected to each other and to the existing building on both floors.
Architecture with HOLODECK ARCITECTS
address:
Speisinger Straße 44, 1130 Wien
completion:
2022
size:
5.400 m² BGF
project team:
Rajna Avramova, Tobias Schedel
client:
MA 19
Bauunternehmung Granit GmbH
outdoor facilities:
Kräftner Landschaftsarchitektur
statics:
ghp gmeiner | haferl & partner
TGA:
Russ Ingenieuere mit Franye Gebäudetechnik,
Elektro MMS
building physics | fire protection:
Vasko+Partner Ingenieure
pictures:
© Kurt Hörbst
Ground floor plan
Floor plan upper floor
Section
Floor plan 1st basement