‘The modular, mobile school is a sustainable contribution to Vienna’s school system. Time and again, teaching operations have to be temporarily relocated to another location due to renovation work, remodelling or similar.’
‘The ‘Monti’ is reusable, flexible and can be quickly adapted to the respective location, making it
a sustainable, resource-saving solution for temporary school space requirements in Vienna. And that in
best structural quality and a modern atmosphere’
(Sigrid Oblak, Managing Director Wien Holding)
Completion:
2019
Dismantling and reassembly – completion:
2021
Adress:
Montlearstraße, Franklinstraße, Vienna
Project team:
Susanne Veit-Aschenbrenner
Oliver Aschenbrenner
Structural Design:
Hollinsky & Partner ZT GmbH
Electrical planning:
HTB Plan
Building Physics:
Danzinger TZ GmbH
Owner:
Stadt Wien – MA56 – Wiener Schulen;
vertreten durch WIP, Wiener Infrastruktur
Projekt GmbH